

Bradfords Building Supplies, Honiton (Jan 12)
Alloway Timber Ltd, West Byfeet (Jan 12)
Fourwoods Ltd, Tetney (Dec 11)
Construction Property Renovations Ltd, Bratton (Dec 11)
Alloway Timber Ltd, West Byfleet (Nov 11)
Qualtex Ltd, Sittingbourne (Nov 11)
All Saints Retail
Step 1) Initial Contact - Our sales office will arrange for the development manager local to you to call you back
Step 2) FREE Site visit - Filplastic will visit your premises to ascertain the specification and your requirements
Step 3) FREE Site survey - If more technical information is required our project manager will visit your premises
Step 4) FREE drawing - Our in house CAD team will provide you with detailed plans for the proposed floor
Step 5) FREE quotation - With no obligation to buy
Step 6) If you decide to order from us we aim for our experienced team to have installed the floor within 3-4 weeks
How Long Will The Process Take From Start To Finish?
Once the drawing has been agreed the floor can be installed within 3-4 weeks from point of order providing that there are no problems with Building Regulations (which is very unlikely). The actual time on site depends on the size of the floor but most can be erected in a few days.
Is It Difficult to Obtain Building Regulations Approval and How Do I Do It?
You don't need to worry about this, we will deal with it through to completion (chargeable only at cost).
Do I Need Planning Permission?
No, because the changes are internal planning permission is not required (unless there is an existing condition written into the original planning consent).
What About Ceilings & Fire Protection?
Filplastic can quote to provide these aspects as well as all other items associated with mezzanine floors such as staircases, tegal gates etc.
To read more about the different types of floors available please click on the links below;
Rack Supported Mezzanine Floor
Freestanding Mezzanine Floor
